CHETEK, Wis. (NWN) — The southbound on ramp for Highway 53 from County Highway I, in Chetek, is closed, starting today, and lasting through October 1.

The Wisconsin DOT is replacing the bridge over the Chetek River and the on ramp will be closed for construction.

Traffic for the southbound on ramp will be detoured north to the Highway 8 and Highway 53 interchange in Cameron.